Parvalux Electric Motors
Poole, Dorset
To accommodate existing operations and add capacity for the future, Parvalux repurposed an 8.75-acre brownfield site in Poole that combines both an HQ and factory onto the same location.
Work began in 2020 on the 160,000 sq ft site - which includes a £3 million investment in new manufacturing capabilities.
Putting it at the forefront of efforts to decarbonise construction, the eco-friendly building has achieved a net zero rating.
Challenge
Structural steel and industrial cladding specialists Jade-Aden Services were contracted to deliver the complete design and build of the new facility. Selected through previous working relationships with locally based larger companies, Jade-Aden brought in a local supply chain to complete the project, ensuring high quality throughout the entire project build.
Solution
The large roof and wall area gave Jade-Aden the opportunity to install Kingspan composite panels with the use of our DrillFast A4/316 stainless steel composite fastener range.

Fasteners are irreplaceable and meant to match the lifespan of the construction they sit within, so using A4/316 stainless steel fasteners ensure the lifespan of this building is secure, even though the building is situated in a coastal environment.
As a demonstration of our continuing commitment to quality, the fasteners were supplied as part of the QuadCore Assured warranty from Kingspan - providing reassurance for the lifetime of the building.