Estimated lead times
1 Day
Estimated lead times
1 Day
Estimated lead times
1 Day
Estimated lead times
1 Day
Estimated lead times
1 Day
Estimated lead times
1 Day
The FO-Spout is designed to guide the water flow from a parapet drain. The fit onto the end of the a FarBo® ParaDrain or SumpDrain after it has been installed through the parapet, and can then be positioned to guide the water into the water control system.
The FO-Spout is designed to guide the water flow from a parapet drain. The fit onto the end of the a FarBo® ParaDrain or SumpDrain after it has been installed through the parapet, and can then be positioned to guide the water into the water control system.